Kingsbury Creek, Duluth, MN
9/26/2010 thru 10/2/2010
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/26 00:00 0.390 0.14 8.7 47.6 255 23.9
2010/09/26 00:15 0.388 0.13 8.6 47.6 255 23.5
2010/09/26 00:30 0.389 0.14 8.6 47.5 255 23.9
2010/09/26 00:45 0.390 0.14 8.5 47.4 256 24.1
2010/09/26 01:00 0.392 0.14 8.5 47.2 256 23.9
2010/09/26 01:15 0.395 0.15 8.4 47.1 257 24.0
2010/09/26 01:30 0.395 0.15 8.4 47.0 257 24.9
2010/09/26 01:45 0.394 0.14 8.3 46.9 257 24.1
2010/09/26 02:00 0.396 0.15 8.2 46.8 257 24.3
2010/09/26 02:15 0.396 0.15 8.2 46.7 258 25.1
2010/09/26 02:30 0.398 0.15 8.1 46.6 258 24.6
2010/09/26 02:45 0.398 0.15 8.0 46.4 258 24.2
2010/09/26 03:00 0.398 0.15 7.9 46.3 259 25.3
2010/09/26 03:15 0.400 0.15 7.9 46.1 259 24.8
2010/09/26 03:30 0.403 0.16 7.8 46.0 260 24.8
2010/09/26 03:45 0.403 0.16 7.7 45.9 260 25.2
2010/09/26 04:00 0.404 0.16 7.7 45.8 260 25.5
2010/09/26 04:15 0.404 0.16 7.6 45.7 261 25.9
2010/09/26 04:30 0.405 0.16 7.5 45.6 261 25.9
2010/09/26 04:45 0.406 0.16 7.5 45.5 262 26.0
2010/09/26 05:00 0.406 0.16 7.4 45.4 262 26.3
2010/09/26 05:15 0.408 0.17 7.4 45.2 262 26.8
2010/09/26 05:30 0.409 0.17 7.3 45.2 263 26.3
2010/09/26 05:45 0.409 0.17 7.2 45.0 263 26.3
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/26 06:00 0.413 0.18 7.2 44.9 264 26.0
2010/09/26 06:15 0.413 0.18 7.1 44.8 264 26.3
2010/09/26 06:30 0.412 0.18 7.1 44.7 264 26.6
2010/09/26 06:45 0.413 0.18 7.0 44.6 265 26.1
2010/09/26 07:00 0.413 0.18 6.9 44.5 265 25.8
2010/09/26 07:15 0.414 0.18 6.9 44.4 266 26.6
2010/09/26 07:30 0.413 0.18 6.9 44.3 266 26.7
2010/09/26 07:45 0.409 0.17 6.8 44.3 267 26.7
2010/09/26 08:00 0.400 0.15 6.8 44.3 267 26.6
2010/09/26 08:15 0.388 0.13 6.9 44.4 267 27.0
2010/09/26 08:30 0.372 0.11 6.9 44.5 267 26.6
2010/09/26 08:45 0.336 0.07 7.0 44.6 268 27.5
2010/09/26 09:00 0.307 0.05 7.1 44.8 268 26.9
2010/09/26 09:15 0.297 0.05 7.2 45.0 268 27.3
2010/09/26 09:30 0.282 0.04 7.3 45.2 268 27.2
2010/09/26 09:45 0.274 0.04 7.5 45.4 269 27.1
2010/09/26 10:00 0.263 0.04 7.6 45.7 269 27.6
2010/09/26 10:15 0.257 0.04 7.8 46.0 270 27.3
2010/09/26 10:30 0.257 0.04 8.0 46.3 270 28.2
2010/09/26 10:45 0.483 0.35 8.1 46.7 270 27.7
2010/09/26 11:00 0.530 0.53 8.3 47.0 271 28.0
2010/09/26 11:15 0.524 0.50 8.5 47.3 271 28.0
2010/09/26 11:30 0.521 0.49 8.6 47.6 271 27.7
2010/09/26 11:45 0.515 0.47 8.7 47.7 272 28.2
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/26 12:00 0.503 0.42 8.9 48.0 272 29.1
2010/09/26 12:15 0.497 0.40 9.1 48.3 273 28.1
2010/09/26 12:30 0.492 0.38 9.2 48.5 273 28.0
2010/09/26 12:45 0.486 0.36 9.3 48.7 273 28.5
2010/09/26 13:00 0.483 0.35 9.4 48.9 274 28.8
2010/09/26 13:15 0.483 0.35 9.5 49.1 274 28.9
2010/09/26 13:30 0.489 0.37 9.6 49.2 275 29.1
2010/09/26 13:45 0.504 0.43 9.6 49.4 275 29.4
2010/09/26 14:00 0.516 0.47 9.7 49.4 276 29.0
2010/09/26 14:15 0.524 0.50 9.7 49.4 276 29.1
2010/09/26 14:30 0.531 0.53 9.7 49.4 276 29.5
2010/09/26 14:45 0.535 0.55 9.7 49.5 277 29.1
2010/09/26 15:00 0.534 0.55 9.7 49.5 277 28.9
2010/09/26 15:15 0.530 0.53 9.7 49.4 278 29.3
2010/09/26 15:30 0.541 0.58 9.6 49.4 278 29.3
2010/09/26 15:45 0.539 0.57 9.7 49.4 278 29.8
2010/09/26 16:00 0.537 0.56 9.7 49.5 279 29.9
2010/09/26 16:15 0.535 0.55 9.7 49.5 279 29.9
2010/09/26 16:30 0.541 0.58 9.8 49.5 279 29.6
2010/09/26 16:45 0.552 0.63 9.7 49.5 280 30.1
2010/09/26 17:00 0.562 0.68 9.7 49.5 280 30.0
2010/09/26 17:15 0.569 0.71 9.8 49.5 280 29.5
2010/09/26 17:30 0.576 0.75 9.8 49.5 281 30.0
2010/09/26 17:45 0.582 0.78 9.8 49.6 281 29.9
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/26 18:00 0.583 0.79 9.8 49.6 281 29.8
2010/09/26 18:15 0.586 0.81 9.8 49.6 282 30.3
2010/09/26 18:30 0.587 0.81 9.8 49.5 282 30.3
2010/09/26 18:45 0.593 0.85 9.7 49.5 282 30.2
2010/09/26 19:00 0.594 0.85 9.7 49.4 282 30.5
2010/09/26 19:15 0.599 0.88 9.6 49.4 283 30.6
2010/09/26 19:30 0.601 0.89 9.6 49.3 283 30.0
2010/09/26 19:45 0.603 0.91 9.6 49.2 283 30.2
2010/09/26 20:00 0.605 0.92 9.5 49.1 283 31.1
2010/09/26 20:15 0.605 0.92 9.4 49.0 283 31.2
2010/09/26 20:30 0.607 0.93 9.4 48.9 284 30.7
2010/09/26 20:45 0.608 0.94 9.3 48.8 284 31.3
2010/09/26 21:00 0.609 0.94 9.3 48.7 284 31.5
2010/09/26 21:15 0.610 0.95 9.2 48.6 284 31.5
2010/09/26 21:30 0.611 0.96 9.2 48.5 284 32.2
2010/09/26 21:45 0.611 0.96 9.1 48.4 285 31.8
2010/09/26 22:00 0.612 0.96 9.0 48.3 285 31.9
2010/09/26 22:15 0.613 0.97 9.0 48.2 285 32.4
2010/09/26 22:30 0.613 0.97 8.9 48.1 286 32.0
2010/09/26 22:45 0.616 0.99 8.9 48.0 286 31.9
2010/09/26 23:00 0.614 0.98 8.8 47.9 286 32.3
2010/09/26 23:15 0.614 0.98 8.8 47.8 287 32.4
2010/09/26 23:30 0.613 0.97 8.8 47.8 287 32.2
2010/09/26 23:45 0.614 0.98 8.7 47.7 287 31.9
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/27 00:00 0.615 0.98 8.7 47.6 288 32.6
2010/09/27 00:15 0.615 0.98 8.6 47.6 288 32.5
2010/09/27 00:30 0.617 1.00 8.6 47.5 288 32.7
2010/09/27 00:45 0.617 1.00 8.6 47.5 289 33.2
2010/09/27 01:00 0.617 1.00 8.6 47.4 289 33.2
2010/09/27 01:15 0.615 0.98 8.5 47.4 289 33.0
2010/09/27 01:30 0.613 0.97 8.5 47.3 290 33.5
2010/09/27 01:45 0.613 0.97 8.5 47.3 290 33.2
2010/09/27 02:00 0.613 0.97 8.4 47.2 290 33.1
2010/09/27 02:15 0.612 0.96 8.4 47.2 291 33.8
2010/09/27 02:30 0.612 0.96 8.4 47.1 291 33.6
2010/09/27 02:45 0.611 0.96 8.4 47.0 292 33.8
2010/09/27 03:00 0.610 0.95 8.3 47.0 292 33.8
2010/09/27 03:15 0.611 0.96 8.3 46.9 293 33.9
2010/09/27 03:30 0.611 0.96 8.3 46.9 293 33.9
2010/09/27 03:45 0.610 0.95 8.2 46.8 293 34.7
2010/09/27 04:00 0.608 0.94 8.2 46.8 294 34.3
2010/09/27 04:15 0.608 0.94 8.2 46.7 294 34.2
2010/09/27 04:30 0.607 0.93 8.2 46.7 294 33.9
2010/09/27 04:45 0.607 0.93 8.1 46.7 295 34.4
2010/09/27 05:00 0.604 0.91 8.1 46.6 295 34.3
2010/09/27 05:15 0.603 0.91 8.1 46.6 296 34.4
2010/09/27 05:30 0.602 0.90 8.1 46.6 296 34.6
2010/09/27 05:45 0.602 0.90 8.1 46.5 296 35.0
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/27 06:00 0.601 0.89 8.1 46.5 297 34.4
2010/09/27 06:15 0.599 0.88 8.1 46.5 297 35.4
2010/09/27 06:30 0.597 0.87 8.0 46.4 297 34.8
2010/09/27 06:45 0.597 0.87 8.0 46.4 298 35.0
2010/09/27 07:00 0.596 0.86 8.0 46.4 298 35.2
2010/09/27 07:15 0.593 0.85 8.0 46.3 299 36.1
2010/09/27 07:30 0.587 0.81 8.0 46.4 299 35.6
2010/09/27 07:45 0.576 0.75 8.0 46.4 299 35.5
2010/09/27 08:00 0.568 0.71 8.0 46.4 299 35.8
2010/09/27 08:15 0.558 0.66 8.1 46.5 300 35.7
2010/09/27 08:30 0.539 0.57 8.1 46.7 300 35.5
2010/09/27 08:45 0.520 0.49 8.3 46.8 300 36.6
2010/09/27 09:00 0.506 0.43 8.3 47.0 300 36.0
2010/09/27 09:15 0.491 0.38 8.4 47.2 301 36.3
2010/09/27 09:30 0.492 0.38 8.5 47.3 301 36.2
2010/09/27 09:45 0.481 0.35 8.6 47.5 301 36.1
2010/09/27 10:00 0.476 0.33 8.7 47.7 302 36.3
2010/09/27 10:15 0.472 0.32 8.8 47.9 302 36.5
2010/09/27 10:30 0.470 0.31 8.9 48.0 302 36.7
2010/09/27 10:45 0.464 0.30 9.0 48.2 302 36.5
2010/09/27 11:00 0.463 0.29 9.1 48.4 303 36.6
2010/09/27 11:15 0.457 0.28 9.2 48.5 303 37.3
2010/09/27 11:30 0.443 0.24 9.3 48.8 303 36.8
2010/09/27 11:45 0.421 0.19 9.6 49.3 304 37.1
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/27 12:00 0.407 0.17 9.9 49.7 304 36.9
2010/09/27 12:15 0.390 0.14 10.1 50.2 304 36.8
2010/09/27 12:30 0.384 0.13 10.3 50.6 304 36.8
2010/09/27 12:45 0.397 0.15 10.4 50.7 304 37.5
2010/09/27 13:00 0.375 0.12 10.6 51.0 305 37.2 0.010
2010/09/27 13:15 0.392 0.14 10.6 51.1 305 37.1
2010/09/27 13:30 0.400 0.15 10.7 51.2 305 37.9
2010/09/27 13:45 0.405 0.16 10.7 51.3 305 37.3
2010/09/27 14:00 0.418 0.19 10.8 51.4 306 37.1 0.030
2010/09/27 14:15 0.450 0.26 10.7 51.3 305 37.9
2010/09/27 14:30 0.478 0.34 10.7 51.3 302 37.9
2010/09/27 14:45 0.483 0.35 10.7 51.3 303 37.5
2010/09/27 15:00 0.474 0.33 10.9 51.6 303 38.0
2010/09/27 15:15 0.468 0.31 11.0 51.8 303 38.1
2010/09/27 15:30 0.472 0.32 11.0 51.9 303 39.6
2010/09/27 15:45 0.472 0.32 11.1 51.9 303 38.8
2010/09/27 16:00 0.474 0.33 11.0 51.9 306 38.8
2010/09/27 16:15 0.480 0.34 10.9 51.7 307 38.7
2010/09/27 16:30 0.492 0.38 10.9 51.7 308 39.1
2010/09/27 16:45 0.499 0.41 10.9 51.6 308 39.7
2010/09/27 17:00 0.499 0.41 10.9 51.6 313 40.0
2010/09/27 17:15 0.494 0.39 10.9 51.7 324 40.4
2010/09/27 17:30 0.493 0.39 11.0 51.8 330 40.1
2010/09/27 17:45 0.498 0.40 11.0 51.8 326 40.4
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/27 18:00 0.500 0.41 11.0 51.8 321 39.9
2010/09/27 18:15 0.503 0.42 11.0 51.7 318 40.1
2010/09/27 18:30 0.505 0.43 10.9 51.7 316 40.2
2010/09/27 18:45 0.508 0.44 10.9 51.7 316 39.9
2010/09/27 19:00 0.512 0.46 10.9 51.6 315 40.4
2010/09/27 19:15 0.514 0.46 10.9 51.5 316 40.3
2010/09/27 19:30 0.516 0.47 10.8 51.5 318 40.4
2010/09/27 19:45 0.518 0.48 10.8 51.4 322 41.3
2010/09/27 20:00 0.519 0.48 10.8 51.4 326 41.2
2010/09/27 20:15 0.517 0.48 10.8 51.4 329 41.0
2010/09/27 20:30 0.513 0.46 10.8 51.4 330 41.5
2010/09/27 20:45 0.509 0.44 10.8 51.5 329 41.1
2010/09/27 21:00 0.507 0.44 10.8 51.5 328 41.3
2010/09/27 21:15 0.505 0.43 10.9 51.5 328 42.1
2010/09/27 21:30 0.504 0.43 10.9 51.6 328 42.0
2010/09/27 21:45 0.504 0.43 10.9 51.6 328 42.0
2010/09/27 22:00 0.504 0.43 10.9 51.6 328 41.9
2010/09/27 22:15 0.504 0.43 10.9 51.5 327 42.0
2010/09/27 22:30 0.508 0.44 10.9 51.5 327 41.6
2010/09/27 22:45 0.510 0.45 10.9 51.5 326 42.7
2010/09/27 23:00 0.507 0.44 10.9 51.6 326 42.1
2010/09/27 23:15 0.506 0.43 10.9 51.6 325 42.1
2010/09/27 23:30 0.500 0.41 10.9 51.6 325 43.1
2010/09/27 23:45 0.497 0.40 10.9 51.7 325 42.5
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/28 00:00 0.489 0.37 10.9 51.7 325 42.4
2010/09/28 00:15 0.485 0.36 11.0 51.8 325 43.2
2010/09/28 00:30 0.484 0.36 11.0 51.8 325 43.1
2010/09/28 00:45 0.485 0.36 11.0 51.8 326 43.2
2010/09/28 01:00 0.492 0.38 11.0 51.8 326 43.4
2010/09/28 01:15 0.495 0.39 11.0 51.8 326 43.5
2010/09/28 01:30 0.492 0.38 11.0 51.8 326 43.7
2010/09/28 01:45 0.489 0.37 11.0 51.8 326 44.3
2010/09/28 02:00 0.487 0.37 11.0 51.9 326 44.0
2010/09/28 02:15 0.488 0.37 11.1 51.9 326 44.1
2010/09/28 02:30 0.491 0.38 11.1 52.0 326 44.9
2010/09/28 02:45 0.494 0.39 11.1 52.0 326 41.7
2010/09/28 03:00 0.491 0.38 11.1 52.0 326 41.6
2010/09/28 03:15 0.485 0.36 11.1 52.0 326 42.5
2010/09/28 03:30 0.484 0.36 11.1 52.0 326 41.6
2010/09/28 03:45 0.485 0.36 11.1 52.0 326 41.3
2010/09/28 04:00 0.492 0.38 11.1 52.0 326 41.9
2010/09/28 04:15 0.498 0.40 11.1 51.9 326 41.6
2010/09/28 04:30 0.507 0.44 11.0 51.8 326 42.4
2010/09/28 04:45 0.514 0.46 11.0 51.8 326 41.9
2010/09/28 05:00 0.510 0.45 11.0 51.8 326 42.1
2010/09/28 05:15 0.507 0.44 11.0 51.7 327 41.8
2010/09/28 05:30 0.510 0.45 10.9 51.7 327 42.0
2010/09/28 05:45 0.510 0.45 10.9 51.7 327 42.1
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/28 06:00 0.510 0.45 10.9 51.7 327 42.4
2010/09/28 06:15 0.511 0.45 10.9 51.6 327 42.1
2010/09/28 06:30 0.514 0.46 10.9 51.6 327 42.5
2010/09/28 06:45 0.515 0.47 10.9 51.5 327 42.6
2010/09/28 07:00 0.517 0.48 10.8 51.5 328 42.7
2010/09/28 07:15 0.517 0.48 10.8 51.5 328 43.4
2010/09/28 07:30 0.517 0.48 10.8 51.5 328 42.6
2010/09/28 07:45 0.519 0.48 10.8 51.4 328 42.7
2010/09/28 08:00 0.517 0.48 10.8 51.4 328 43.8
2010/09/28 08:15 0.516 0.47 10.8 51.5 328 43.0
2010/09/28 08:30 0.514 0.46 10.8 51.5 328 42.4
2010/09/28 08:45 0.512 0.46 10.8 51.5 328 43.3
2010/09/28 09:00 0.513 0.46 10.9 51.5 328 43.1
2010/09/28 09:15 0.510 0.45 10.9 51.6 328 44.1
2010/09/28 09:30 0.508 0.44 10.9 51.6 327 44.4
2010/09/28 09:45 0.504 0.43 10.9 51.7 327 43.8
2010/09/28 10:00 0.500 0.41 11.0 51.7 327 44.2
2010/09/28 10:15 0.497 0.40 11.0 51.8 327 44.5
2010/09/28 10:30 0.495 0.39 11.0 51.8 327 43.5
2010/09/28 10:45 0.496 0.40 11.0 51.8 327 43.5
2010/09/28 11:00 0.492 0.38 11.0 51.9 327 43.7
2010/09/28 11:15 0.488 0.37 11.1 51.9 327 43.2
2010/09/28 11:30 0.480 0.34 11.1 52.0 327 43.3
2010/09/28 11:45 0.470 0.31 11.2 52.2 327 43.7
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/28 12:00 0.461 0.29 11.3 52.3 327 44.0
2010/09/28 12:15 0.455 0.27 11.3 52.4 327 43.8
2010/09/28 12:30 0.450 0.26 11.4 52.4 327 43.8
2010/09/28 12:45 0.446 0.25 11.4 52.5 328 44.3
2010/09/28 13:00 0.438 0.23 11.5 52.7 328 44.5
2010/09/28 13:15 0.434 0.22 11.5 52.8 328 44.6
2010/09/28 13:30 0.435 0.22 11.6 52.8 328 44.9
2010/09/28 13:45 0.436 0.23 11.6 52.9 328 44.4
2010/09/28 14:00 0.440 0.23 11.6 52.8 328 44.9
2010/09/28 14:15 0.443 0.24 11.6 52.8 329 45.1
2010/09/28 14:30 0.446 0.25 11.6 52.8 329 44.8
2010/09/28 14:45 0.448 0.25 11.5 52.8 329 45.0
2010/09/28 15:00 0.450 0.26 11.5 52.7 329 45.3
2010/09/28 15:15 0.453 0.27 11.5 52.7 329 44.6
2010/09/28 15:30 0.454 0.27 11.5 52.7 329 45.3
2010/09/28 15:45 0.457 0.28 11.5 52.6 329 45.5
2010/09/28 16:00 0.461 0.29 11.4 52.6 329 44.8
2010/09/28 16:15 0.464 0.30 11.4 52.5 329 45.1
2010/09/28 16:30 0.466 0.30 11.4 52.5 329 45.2
2010/09/28 16:45 0.469 0.31 11.4 52.4 330 44.9
2010/09/28 17:00 0.474 0.33 11.3 52.4 330 44.6
2010/09/28 17:15 0.475 0.33 11.3 52.3 330 45.3
2010/09/28 17:30 0.479 0.34 11.3 52.3 330 45.1
2010/09/28 17:45 0.481 0.35 11.2 52.2 330 45.1
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/28 18:00 0.485 0.36 11.2 52.2 331 45.4
2010/09/28 18:15 0.488 0.37 11.2 52.1 331 45.2
2010/09/28 18:30 0.489 0.37 11.1 52.0 331 45.3
2010/09/28 18:45 0.489 0.37 11.1 52.0 331 45.5
2010/09/28 19:00 0.490 0.38 11.1 51.9 332 45.4
2010/09/28 19:15 0.494 0.39 11.0 51.8 332 45.4
2010/09/28 19:30 0.496 0.40 11.0 51.8 332 46.0
2010/09/28 19:45 0.497 0.40 10.9 51.7 332 46.2
2010/09/28 20:00 0.498 0.40 10.9 51.7 332 45.8
2010/09/28 20:15 0.499 0.41 10.9 51.6 333 46.5
2010/09/28 20:30 0.501 0.42 10.9 51.5 333 46.0
2010/09/28 20:45 0.502 0.42 10.8 51.5 333 46.4
2010/09/28 21:00 0.501 0.42 10.8 51.5 333 46.8
2010/09/28 21:15 0.499 0.41 10.8 51.5 334 46.7
2010/09/28 21:30 0.499 0.41 10.8 51.4 335 46.6
2010/09/28 21:45 0.499 0.41 10.8 51.4 335 47.3
2010/09/28 22:00 0.498 0.40 10.8 51.3 336 47.0
2010/09/28 22:15 0.497 0.40 10.7 51.3 336 46.6
2010/09/28 22:30 0.497 0.40 10.7 51.3 336 47.9
2010/09/28 22:45 0.497 0.40 10.7 51.3 337 47.8
2010/09/28 23:00 0.496 0.40 10.7 51.3 337 47.5
2010/09/28 23:15 0.497 0.40 10.7 51.2 337 48.3
2010/09/28 23:30 0.499 0.41 10.7 51.2 337 47.7
2010/09/28 23:45 0.499 0.41 10.6 51.1 337 33.0
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/29 00:00 0.499 0.41 10.6 51.1 337 34.8
2010/09/29 00:15 0.498 0.40 10.6 51.1 337 34.0
2010/09/29 00:30 0.499 0.41 10.6 51.0 337 34.3
2010/09/29 00:45 0.501 0.42 10.5 51.0 337 36.2
2010/09/29 01:00 0.507 0.44 10.5 50.9 337 32.4
2010/09/29 01:15 0.514 0.46 10.4 50.8 337 32.5
2010/09/29 01:30 0.514 0.46 10.4 50.6 338 33.5
2010/09/29 01:45 0.513 0.46 10.3 50.5 338 32.6
2010/09/29 02:00 0.514 0.46 10.2 50.4 338 34.1
2010/09/29 02:15 0.514 0.46 10.2 50.3 338 8.7
2010/09/29 02:30 0.517 0.48 10.1 50.2 338 5.3
2010/09/29 02:45 0.517 0.48 10.1 50.1 338 5.7
2010/09/29 03:00 0.515 0.47 10.0 50.1 338 6.5
2010/09/29 03:15 0.515 0.47 10.0 49.9 339 6.2
2010/09/29 03:30 0.516 0.47 9.9 49.8 339 5.6
2010/09/29 03:45 0.517 0.48 9.9 49.7 339 7.9
2010/09/29 04:00 0.517 0.48 9.8 49.7 339 6.4
2010/09/29 04:15 0.516 0.47 9.8 49.6 339 5.7
2010/09/29 04:30 0.515 0.47 9.8 49.5 339 6.8
2010/09/29 04:45 0.516 0.47 9.7 49.5 340 6.1
2010/09/29 05:00 0.514 0.46 9.7 49.5 340 5.9
2010/09/29 05:15 0.511 0.45 9.7 49.5 340 5.7
2010/09/29 05:30 0.508 0.44 9.7 49.4 340 6.2
2010/09/29 05:45 0.506 0.43 9.7 49.4 340 5.7
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/29 06:00 0.503 0.42 9.6 49.4 341 5.3
2010/09/29 06:15 0.501 0.42 9.6 49.3 341 6.3
2010/09/29 06:30 0.498 0.40 9.6 49.3 341 5.6
2010/09/29 06:45 0.497 0.40 9.6 49.3 341 5.4
2010/09/29 07:00 0.495 0.39 9.6 49.3 341 6.4
2010/09/29 07:15 0.492 0.38 9.6 49.2 342 5.7
2010/09/29 07:30 0.489 0.37 9.6 49.2 342 5.6
2010/09/29 07:45 0.484 0.36 9.6 49.3 342 6.1
2010/09/29 08:00 0.472 0.32 9.6 49.3 342 6.0
2010/09/29 08:15 0.460 0.29 9.7 49.4 342 5.7
2010/09/29 08:30 0.445 0.25 9.8 49.6 342 8.1
2010/09/29 08:45 0.415 0.18 9.9 49.8 343 6.3
2010/09/29 09:00 0.398 0.15 10.1 50.1 343 5.8
2010/09/29 09:15 0.390 0.14 10.2 50.4 343 7.6
2010/09/29 09:30 0.383 0.13 10.3 50.6 343 6.2
2010/09/29 09:45 0.370 0.11 10.5 51.0 343 5.6
2010/09/29 10:00 0.368 0.11 10.7 51.3 343 7.7
2010/09/29 10:15 0.376 0.12 10.8 51.3 344 6.6
2010/09/29 10:30 0.379 0.12 10.8 51.4 344 5.6
2010/09/29 10:45 0.384 0.13 10.9 51.6 344 6.1
2010/09/29 11:00 0.381 0.12 11.0 51.8 344 6.0 0.130
2010/09/29 11:15 0.396 0.15 11.0 51.9 344 5.9
2010/09/29 11:30 0.416 0.18 11.1 51.9 344 5.8
2010/09/29 11:45 0.430 0.21 11.1 52.0 343 6.3
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/29 12:00 0.429 0.21 11.1 52.1 341 5.7 0.050
2010/09/29 12:15 0.441 0.24 11.2 52.1 339 5.7
2010/09/29 12:30 0.447 0.25 11.2 52.1 339 6.9
2010/09/29 12:45 0.439 0.23 11.3 52.3 340 6.3
2010/09/29 13:00 0.427 0.21 11.4 52.5 340 6.5
2010/09/29 13:15 0.422 0.19 11.5 52.8 339 7.7
2010/09/29 13:30 0.405 0.16 11.8 53.3 338 6.8
2010/09/29 13:45 0.395 0.15 12.1 53.7 340 6.8
2010/09/29 14:00 0.386 0.13 12.3 54.0 344 7.2
2010/09/29 14:15 0.402 0.16 12.3 54.2 345 7.9
2010/09/29 14:30 0.414 0.18 12.4 54.2 345 9.7
2010/09/29 14:45 0.413 0.18 12.3 54.2 357 10.3
2010/09/29 15:00 0.407 0.17 12.3 54.2 368 9.7
2010/09/29 15:15 0.405 0.16 12.4 54.2 362 9.5
2010/09/29 15:30 0.388 0.13 12.5 54.5 353 9.3
2010/09/29 15:45 0.381 0.12 12.6 54.6 346 7.8
2010/09/29 16:00 0.383 0.13 12.6 54.6 345 7.9
2010/09/29 16:15 0.379 0.12 12.6 54.7 346 8.4
2010/09/29 16:30 0.374 0.11 12.6 54.7 347 7.4
2010/09/29 16:45 0.378 0.12 12.6 54.7 347 7.8
2010/09/29 17:00 0.385 0.13 12.6 54.7 350 9.2 0.005
2010/09/29 17:15 0.401 0.16 12.6 54.6 359 8.7
2010/09/29 17:30 0.418 0.19 12.5 54.5 377 10.5
2010/09/29 17:45 0.426 0.20 12.5 54.5 396 12.7
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/29 18:00 0.437 0.23 12.5 54.5 405 13.6 0.005
2010/09/29 18:15 0.454 0.27 12.5 54.4 404 15.3
2010/09/29 18:30 0.464 0.30 12.4 54.4 400 15.5
2010/09/29 18:45 0.465 0.30 12.4 54.4 398 13.2
2010/09/29 19:00 0.471 0.32 12.4 54.3 398 12.0
2010/09/29 19:15 0.477 0.34 12.3 54.2 399 11.3
2010/09/29 19:30 0.482 0.35 12.3 54.1 399 10.2
2010/09/29 19:45 0.487 0.37 12.2 54.0 399 10.0
2010/09/29 20:00 0.490 0.38 12.2 53.9 399 10.0
2010/09/29 20:15 0.493 0.39 12.1 53.8 400 9.0
2010/09/29 20:30 0.497 0.40 12.1 53.7 401 8.7
2010/09/29 20:45 0.499 0.41 12.0 53.6 403 9.7
2010/09/29 21:00 0.501 0.42 12.0 53.5 404 8.6
2010/09/29 21:15 0.504 0.43 11.9 53.4 405 8.9
2010/09/29 21:30 0.506 0.43 11.9 53.3 405 9.0
2010/09/29 21:45 0.508 0.44 11.8 53.2 405 8.4
2010/09/29 22:00 0.510 0.45 11.8 53.2 405 9.0 0.005
2010/09/29 22:15 0.510 0.45 11.7 53.1 404 9.4
2010/09/29 22:30 0.511 0.45 11.7 53.0 402 8.7
2010/09/29 22:45 0.512 0.46 11.6 53.0 400 9.2
2010/09/29 23:00 0.514 0.46 11.6 52.9 397 10.6
2010/09/29 23:15 0.516 0.47 11.6 52.8 394 9.7
2010/09/29 23:30 0.518 0.48 11.5 52.7 390 9.4
2010/09/29 23:45 0.519 0.48 11.5 52.7 387 9.8
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/30 00:00 0.521 0.49 11.4 52.6 383 10.2
2010/09/30 00:15 0.522 0.50 11.4 52.5 380 9.6
2010/09/30 00:30 0.524 0.50 11.3 52.4 377 10.6
2010/09/30 00:45 0.526 0.51 11.3 52.3 374 9.5
2010/09/30 01:00 0.529 0.52 11.2 52.2 371 9.4
2010/09/30 01:15 0.529 0.52 11.2 52.1 369 10.8
2010/09/30 01:30 0.531 0.53 11.1 52.1 367 9.5
2010/09/30 01:45 0.534 0.55 11.1 52.0 365 9.3
2010/09/30 02:00 0.536 0.55 11.1 51.9 364 10.9
2010/09/30 02:15 0.537 0.56 11.0 51.8 363 9.9
2010/09/30 02:30 0.540 0.57 11.0 51.7 362 9.1
2010/09/30 02:45 0.541 0.58 10.9 51.7 361 11.1
2010/09/30 03:00 0.542 0.58 10.9 51.6 360 9.5
2010/09/30 03:15 0.544 0.59 10.8 51.5 358 9.7
2010/09/30 03:30 0.545 0.60 10.8 51.4 357 11.8
2010/09/30 03:45 0.546 0.60 10.7 51.3 357 9.8
2010/09/30 04:00 0.548 0.61 10.7 51.2 356 9.7
2010/09/30 04:15 0.551 0.62 10.6 51.1 355 10.1
2010/09/30 04:30 0.552 0.63 10.6 51.1 355 9.7
2010/09/30 04:45 0.552 0.63 10.6 51.0 355 8.9
2010/09/30 05:00 0.551 0.62 10.5 50.9 355 11.2
2010/09/30 05:15 0.551 0.62 10.5 50.8 354 9.4
2010/09/30 05:30 0.551 0.62 10.4 50.8 354 9.5
2010/09/30 05:45 0.552 0.63 10.4 50.7 354 11.5
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/30 06:00 0.553 0.63 10.4 50.6 354 10.3
2010/09/30 06:15 0.556 0.65 10.3 50.5 354 9.8
2010/09/30 06:30 0.558 0.66 10.3 50.4 354 10.9
2010/09/30 06:45 0.560 0.67 10.2 50.4 354 10.1
2010/09/30 07:00 0.559 0.66 10.1 50.3 354 9.7
2010/09/30 07:15 0.559 0.66 10.1 50.2 353 10.4
2010/09/30 07:30 0.560 0.67 10.1 50.1 353 10.5
2010/09/30 07:45 0.560 0.67 10.0 50.1 352 10.3
2010/09/30 08:00 0.551 0.62 10.0 50.1 352 11.7
2010/09/30 08:15 0.545 0.60 10.0 50.1 351 10.9
2010/09/30 08:30 0.531 0.53 10.1 50.1 351 10.1
2010/09/30 08:45 0.497 0.40 10.1 50.2 351 10.3
2010/09/30 09:00 0.468 0.31 10.2 50.4 350 11.5
2010/09/30 09:15 0.457 0.28 10.3 50.6 350 10.1
2010/09/30 09:30 0.446 0.25 10.4 50.8 349 10.2
2010/09/30 09:45 0.439 0.23 10.5 51.0 349 11.1
2010/09/30 10:00 0.428 0.21 10.7 51.2 349 9.6
2010/09/30 10:15 0.419 0.19 10.8 51.5 349 9.8
2010/09/30 10:30 0.411 0.17 11.0 51.7 348 10.3
2010/09/30 10:45 0.401 0.16 11.1 52.0 348 10.7
2010/09/30 11:00 0.395 0.15 11.3 52.4 348 9.8
2010/09/30 11:15 0.387 0.13 11.5 52.7 348 10.3
2010/09/30 11:30 0.379 0.12 11.6 53.0 347 9.8
2010/09/30 11:45 0.373 0.11 11.8 53.3 347 10.8
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/30 12:00 0.369 0.11 12.0 53.6 347 11.2
2010/09/30 12:15 0.364 0.10 12.1 53.8 347 9.9
2010/09/30 12:30 0.354 0.09 12.3 54.1 347 9.8
2010/09/30 12:45 0.351 0.09 12.4 54.3 347 11.2
2010/09/30 13:00 0.360 0.10 12.5 54.5 347 10.3
2010/09/30 13:15 0.371 0.11 12.5 54.5 346 11.2
2010/09/30 13:30 0.397 0.15 12.5 54.4 346 12.6
2010/09/30 13:45 0.412 0.18 12.5 54.5 346 10.3
2010/09/30 14:00 0.419 0.19 12.6 54.6 346 10.1
2010/09/30 14:15 0.426 0.20 12.6 54.7 346 11.7
2010/09/30 14:30 0.423 0.20 12.7 54.9 346 10.1
2010/09/30 14:45 0.425 0.20 12.7 54.9 345 10.3
2010/09/30 15:00 0.428 0.21 12.7 54.9 345 11.4
2010/09/30 15:15 0.430 0.21 12.7 54.9 345 10.6
2010/09/30 15:30 0.436 0.23 12.6 54.7 345 10.2
2010/09/30 15:45 0.442 0.24 12.5 54.5 345 11.5
2010/09/30 16:00 0.440 0.23 12.5 54.4 344 10.4
2010/09/30 16:15 0.442 0.24 12.4 54.4 344 10.5
2010/09/30 16:30 0.443 0.24 12.4 54.3 344 11.7
2010/09/30 16:45 0.448 0.25 12.4 54.2 344 10.7
2010/09/30 17:00 0.454 0.27 12.3 54.1 344 10.6
2010/09/30 17:15 0.457 0.28 12.3 54.1 344 11.7
2010/09/30 17:30 0.461 0.29 12.2 54.0 344 10.9
2010/09/30 17:45 0.468 0.31 12.2 54.0 343 11.2
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/09/30 18:00 0.473 0.32 12.2 53.9 343 10.6
2010/09/30 18:15 0.480 0.34 12.1 53.8 343 10.4
2010/09/30 18:30 0.486 0.36 12.1 53.7 343 11.8
2010/09/30 18:45 0.490 0.38 12.0 53.7 343 10.8
2010/09/30 19:00 0.496 0.40 12.0 53.5 343 10.8
2010/09/30 19:15 0.501 0.42 11.9 53.4 343 12.0
2010/09/30 19:30 0.505 0.43 11.9 53.3 343 11.4
2010/09/30 19:45 0.506 0.43 11.8 53.2 343 10.9
2010/09/30 20:00 0.509 0.44 11.7 53.1 343 12.5
2010/09/30 20:15 0.513 0.46 11.7 53.0 343 11.4
2010/09/30 20:30 0.515 0.47 11.6 52.9 343 11.3
2010/09/30 20:45 0.517 0.48 11.5 52.7 343 12.6
2010/09/30 21:00 0.519 0.48 11.4 52.6 343 11.6
2010/09/30 21:15 0.520 0.49 11.4 52.5 344 11.4
2010/09/30 21:30 0.523 0.50 11.3 52.3 344 12.8
2010/09/30 21:45 0.526 0.51 11.2 52.2 345 12.0
2010/09/30 22:00 0.527 0.52 11.1 52.1 345 11.9
2010/09/30 22:15 0.530 0.53 11.1 51.9 346 14.2
2010/09/30 22:30 0.532 0.54 11.0 51.8 346 12.5
2010/09/30 22:45 0.531 0.53 10.9 51.7 347 12.2
2010/09/30 23:00 0.534 0.55 10.8 51.5 347 13.7
2010/09/30 23:15 0.536 0.55 10.8 51.4 348 12.2
2010/09/30 23:30 0.538 0.56 10.7 51.3 348 11.8
2010/09/30 23:45 0.540 0.57 10.6 51.2 349 13.6
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/01 00:00 0.540 0.57 10.6 51.0 349 12.4
2010/10/01 00:15 0.540 0.57 10.5 50.9 350 11.8
2010/10/01 00:30 0.541 0.58 10.4 50.8 350 14.0
2010/10/01 00:45 0.541 0.58 10.4 50.7 350 12.6
2010/10/01 01:00 0.544 0.59 10.3 50.6 350 11.8
2010/10/01 01:15 0.545 0.60 10.3 50.5 350 13.4
2010/10/01 01:30 0.545 0.60 10.2 50.4 350 12.5
2010/10/01 01:45 0.547 0.60 10.2 50.3 350 12.0
2010/10/01 02:00 0.548 0.61 10.1 50.2 350 15.6
2010/10/01 02:15 0.551 0.62 10.1 50.1 350 13.9
2010/10/01 02:30 0.551 0.62 10.0 50.0 349 12.5
2010/10/01 02:45 0.549 0.61 9.9 49.9 349 12.1
2010/10/01 03:00 0.548 0.61 9.9 49.8 349 12.2
2010/10/01 03:15 0.546 0.60 9.9 49.8 349 12.2
2010/10/01 03:30 0.543 0.59 9.8 49.7 349 12.0
2010/10/01 03:45 0.542 0.58 9.8 49.7 349 12.7
2010/10/01 04:00 0.541 0.58 9.8 49.6 348 12.4
2010/10/01 04:15 0.545 0.60 9.8 49.5 349 42.2
2010/10/01 04:30 0.549 0.61 9.7 49.5 348 52.5
2010/10/01 04:45 0.551 0.62 9.6 49.4 348 53.5
2010/10/01 05:00 0.551 0.62 9.6 49.3 348 52.3
2010/10/01 05:15 0.550 0.62 9.6 49.2 348 52.3
2010/10/01 05:30 0.548 0.61 9.6 49.2 349 46.3
2010/10/01 05:45 0.547 0.60 9.5 49.2 349 51.9
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/01 06:00 0.546 0.60 9.5 49.2 349 56.5
2010/10/01 06:15 0.549 0.61 9.5 49.1 349 52.6
2010/10/01 06:30 0.551 0.62 9.4 49.0 349 54.0
2010/10/01 06:45 0.555 0.64 9.4 48.9 349 58.5
2010/10/01 07:00 0.556 0.65 9.4 48.8 349 52.0
2010/10/01 07:15 0.554 0.64 9.3 48.8 350 53.7
2010/10/01 07:30 0.547 0.60 9.3 48.8 350 56.1
2010/10/01 07:45 0.542 0.58 9.3 48.8 350 54.2
2010/10/01 08:00 0.538 0.56 9.4 48.8 350 53.0
2010/10/01 08:15 0.532 0.54 9.4 48.9 351 52.1
2010/10/01 08:30 0.524 0.50 9.4 48.9 351 54.8
2010/10/01 08:45 0.517 0.48 9.4 49.0 351 58.5
2010/10/01 09:00 0.515 0.47 9.5 49.0 351 56.6 0.020
2010/10/01 09:15 0.515 0.47 9.5 49.1 351 57.3
2010/10/01 09:30 0.515 0.47 9.5 49.1 352 57.4
2010/10/01 09:45 0.517 0.48 9.5 49.1 352 58.0
2010/10/01 10:00 0.518 0.48 9.5 49.2 351 58.6 0.030
2010/10/01 10:15 0.520 0.49 9.6 49.2 350 60.4
2010/10/01 10:30 0.522 0.50 9.6 49.2 349 54.3
2010/10/01 10:45 0.522 0.50 9.6 49.3 347 56.8
2010/10/01 11:00 0.521 0.49 9.6 49.4 346 57.0 0.060
2010/10/01 11:15 0.522 0.50 9.7 49.4 345 57.3
2010/10/01 11:30 0.519 0.48 9.7 49.5 343 56.7
2010/10/01 11:45 0.518 0.48 9.8 49.6 342 57.2
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/01 12:00 0.519 0.48 9.8 49.6 340 57.7 0.005
2010/10/01 12:15 0.517 0.48 9.9 49.7 339 57.8
2010/10/01 12:30 0.515 0.47 9.9 49.8 339 57.2
2010/10/01 12:45 0.516 0.47 10.0 50.0 339 62.7
2010/10/01 13:00 0.523 0.50 10.1 50.1 341 63.1
2010/10/01 13:15 0.513 0.46 10.3 50.5 345 64.6
2010/10/01 13:30 0.522 0.50 10.4 50.8 348 70.0
2010/10/01 13:45 0.526 0.51 10.5 51.0 359 64.9
2010/10/01 14:00 0.522 0.50 10.7 51.2 365 71.5 0.005
2010/10/01 14:15 0.518 0.48 10.8 51.5 358 70.7
2010/10/01 14:30 0.511 0.45 11.0 51.8 346 71.4
2010/10/01 14:45 0.502 0.42 11.1 52.0 341 73.9
2010/10/01 15:00 0.520 0.49 11.0 51.8 337 75.8 0.005
2010/10/01 15:15 0.554 0.64 10.9 51.7 330 85.2
2010/10/01 15:30 0.553 0.63 10.9 51.6 330 69.4
2010/10/01 15:45 0.558 0.66 11.0 51.7 332 52.6
2010/10/01 16:00 0.554 0.64 10.9 51.7 341 54.4
2010/10/01 16:15 0.567 0.70 10.9 51.7 358 57.8
2010/10/01 16:30 0.578 0.76 11.0 51.7 382 59.6
2010/10/01 16:45 0.586 0.81 11.0 51.7 398 61.0
2010/10/01 17:00 0.604 0.91 10.9 51.6 404 62.3 0.020
2010/10/01 17:15 0.622 1.03 10.9 51.6 404 69.5
2010/10/01 17:30 0.628 1.07 10.9 51.6 401 71.1
2010/10/01 17:45 0.624 1.04 10.9 51.6 396 69.5
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/01 18:00 0.621 1.02 10.9 51.6 397 68.9 0.005
2010/10/01 18:15 0.620 1.02 10.9 51.5 407 67.1
2010/10/01 18:30 0.625 1.05 10.8 51.4 420 65.7
2010/10/01 18:45 0.628 1.07 10.7 51.2 428 60.8
2010/10/01 19:00 0.629 1.08 10.6 51.1 428 64.3
2010/10/01 19:15 0.631 1.09 10.5 50.9 423 66.9
2010/10/01 19:30 0.632 1.10 10.5 50.8 419 68.2
2010/10/01 19:45 0.633 1.11 10.4 50.7 421 73.6
2010/10/01 20:00 0.635 1.12 10.3 50.6 424 70.2
2010/10/01 20:15 0.641 1.16 10.3 50.4 421 73.0
2010/10/01 20:30 0.642 1.17 10.2 50.3 413 77.2
2010/10/01 20:45 0.640 1.16 10.1 50.2 412 75.5
2010/10/01 21:00 0.639 1.15 10.1 50.1 414 74.4
2010/10/01 21:15 0.634 1.11 10.0 50.0 415 77.2
2010/10/01 21:30 0.629 1.08 10.0 50.0 413 74.2
2010/10/01 21:45 0.630 1.08 10.0 49.9 413 70.0
2010/10/01 22:00 0.631 1.09 9.9 49.8 414 71.7
2010/10/01 22:15 0.626 1.06 9.8 49.6 415 76.4
2010/10/01 22:30 0.626 1.06 9.7 49.5 415 76.7
2010/10/01 22:45 0.622 1.03 9.7 49.4 414 77.3
2010/10/01 23:00 0.622 1.03 9.6 49.3 413 76.1
2010/10/01 23:15 0.620 1.02 9.6 49.2 410 78.1
2010/10/01 23:30 0.617 1.00 9.5 49.1 405 78.9
2010/10/01 23:45 0.616 0.99 9.5 49.0 400 101.2
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/02 00:00 0.613 0.97 9.4 49.0 395 32.5
2010/10/02 00:15 0.614 0.98 9.4 48.9 390 30.9
2010/10/02 00:30 0.600 0.89 9.3 48.7 386 29.7
2010/10/02 00:45 0.354 0.09 9.2 48.6 381 32.2
2010/10/02 01:00 0.358 0.09 9.1 48.4 377 29.5
2010/10/02 01:15 0.361 0.10 9.0 48.3 373 28.9
2010/10/02 01:30 0.363 0.10 9.0 48.1 370 27.7
2010/10/02 01:45 0.363 0.10 8.9 48.0 368 26.9
2010/10/02 02:00 0.365 0.10 8.8 47.9 367 27.7
2010/10/02 02:15 0.367 0.11 8.7 47.7 366 30.4
2010/10/02 02:30 0.370 0.11 8.6 47.6 366 26.2
2010/10/02 02:45 0.369 0.11 8.6 47.4 365 24.9
2010/10/02 03:00 0.371 0.11 8.5 47.3 364 25.8
2010/10/02 03:15 0.374 0.11 8.4 47.2 364 24.2
2010/10/02 03:30 0.376 0.12 8.4 47.0 362 22.1
2010/10/02 03:45 0.378 0.12 8.3 46.9 361 23.7
2010/10/02 04:00 0.380 0.12 8.2 46.8 359 23.4
2010/10/02 04:15 0.381 0.12 8.1 46.7 357 23.0
2010/10/02 04:30 0.382 0.13 8.1 46.5 355 21.7
2010/10/02 04:45 0.383 0.13 8.0 46.4 354 22.7
2010/10/02 05:00 0.385 0.13 7.9 46.3 352 22.7
2010/10/02 05:15 0.387 0.13 7.9 46.2 350 21.6
2010/10/02 05:30 0.390 0.14 7.8 46.1 349 23.1
2010/10/02 05:45 0.390 0.14 7.8 46.0 347 20.9
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/02 06:00 0.389 0.14 7.7 45.9 346 22.3
2010/10/02 06:15 0.390 0.14 7.7 45.8 345 24.1
2010/10/02 06:30 0.394 0.14 7.6 45.7 344 22.5
2010/10/02 06:45 0.395 0.15 7.6 45.6 343 20.8
2010/10/02 07:00 0.397 0.15 7.5 45.5 342 22.6
2010/10/02 07:15 0.399 0.15 7.5 45.4 341 22.0
2010/10/02 07:30 0.398 0.15 7.4 45.4 340 21.3
2010/10/02 07:45 0.398 0.15 7.4 45.4 339 20.8
2010/10/02 08:00 0.391 0.14 7.4 45.3 338 23.3
2010/10/02 08:15 0.387 0.13 7.4 45.4 336 21.3
2010/10/02 08:30 0.374 0.11 7.4 45.4 336 21.2
2010/10/02 08:45 0.339 0.08 7.5 45.4 335 21.9
2010/10/02 09:00 0.317 0.06 7.5 45.5 334 20.4
2010/10/02 09:15 0.304 0.05 7.6 45.7 333 20.8
2010/10/02 09:30 0.295 0.05 7.7 45.8 332 22.7
2010/10/02 09:45 0.287 0.04 7.8 46.0 332 21.7
2010/10/02 10:00 0.276 0.04 7.9 46.3 331 20.2
2010/10/02 10:15 0.270 0.04 8.1 46.5 330 20.5
2010/10/02 10:30 0.259 0.04 8.2 46.8 330 23.0
2010/10/02 10:45 0.254 0.03 8.3 47.0 329 20.8
2010/10/02 11:00 0.244 0.03 8.4 47.2 328 19.2
2010/10/02 11:15 0.241 0.03 8.6 47.4 327 22.2
2010/10/02 11:30 0.242 0.03 8.7 47.7 327 20.3
2010/10/02 11:45 0.245 0.03 8.8 47.8 326 20.3
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/02 12:00 0.253 0.03 8.9 48.0 326 25.8
2010/10/02 12:15 0.504 0.43 9.0 48.2 326 21.0
2010/10/02 12:30 0.505 0.43 9.1 48.4 325 21.3
2010/10/02 12:45 0.502 0.42 9.2 48.6 325 22.4
2010/10/02 13:00 0.505 0.43 9.3 48.7 324 20.9
2010/10/02 13:15 0.502 0.42 9.4 49.0 324 21.4
2010/10/02 13:30 0.512 0.46 9.5 49.0 323 20.8
2010/10/02 13:45 0.533 0.54 9.5 49.1 323 19.9
2010/10/02 14:00 0.556 0.65 9.5 49.1 323 19.7
2010/10/02 14:15 0.566 0.70 9.5 49.2 322 18.4
2010/10/02 14:30 0.578 0.76 9.5 49.2 322 20.7
2010/10/02 14:45 0.587 0.81 9.5 49.1 321 20.1
2010/10/02 15:00 0.588 0.82 9.5 49.2 321 19.5
2010/10/02 15:15 0.585 0.80 9.5 49.2 320 21.6
2010/10/02 15:30 0.593 0.85 9.5 49.1 320 19.6
2010/10/02 15:45 0.591 0.84 9.4 49.0 320 20.7
2010/10/02 16:00 0.594 0.85 9.4 48.8 319 23.3
2010/10/02 16:15 0.596 0.86 9.3 48.7 319 20.9
2010/10/02 16:30 0.596 0.86 9.2 48.6 319 20.9
2010/10/02 16:45 0.595 0.86 9.1 48.4 319 22.0
2010/10/02 17:00 0.588 0.82 9.1 48.4 318 21.3
2010/10/02 17:15 0.590 0.83 9.0 48.3 318 21.9
2010/10/02 17:30 0.589 0.82 9.0 48.2 318 22.5
2010/10/02 17:45 0.579 0.77 9.0 48.2 317 21.5
Date Time StageHt Flow Temp Temp EC25 Turb Precip
yyyy/MM/dd HH:mm m m3/sec ° C ° F uS/cm NTU inches
========== ===== ======= ======= ======= ======= ======= ======= ========
2010/10/02 18:00 0.571 0.72 8.9 48.1 317 21.3
2010/10/02 18:15 0.331 0.07 8.9 48.0 317 20.7
2010/10/02 18:30 0.332 0.07 8.8 47.9 316 23.4
2010/10/02 18:45 0.335 0.07 8.8 47.8 316 22.4
2010/10/02 19:00 0.339 0.08 8.7 47.7 315 22.4
2010/10/02 19:15 0.339 0.08 8.7 47.6 315 22.8
2010/10/02 19:30 0.343 0.08 8.6 47.5 315 22.4
2010/10/02 19:45 0.346 0.08 8.6 47.4 314 23.1
2010/10/02 20:00 0.348 0.08 8.5 47.3 314 23.9
2010/10/02 20:15 0.349 0.09 8.4 47.2 314 21.2
2010/10/02 20:30 0.351 0.09 8.4 47.1 314 21.0
2010/10/02 20:45 0.354 0.09 8.3 47.0 313 23.8
2010/10/02 21:00 0.357 0.09 8.2 46.8 313 22.3
2010/10/02 21:15 0.357 0.09 8.2 46.7 313 22.9
2010/10/02 21:30 0.358 0.09 8.1 46.6 313 21.6
2010/10/02 21:45 0.359 0.10 8.1 46.5 313 25.3
2010/10/02 22:00 0.362 0.10 8.0 46.4 313 21.7
2010/10/02 22:15 0.363 0.10 7.9 46.3 313 21.6
2010/10/02 22:30 0.366 0.10 7.9 46.2 313 22.6
2010/10/02 22:45 0.367 0.11 7.8 46.1 313 23.3
2010/10/02 23:00 0.369 0.11 7.7 45.9 313 21.4
2010/10/02 23:15 0.371 0.11 7.7 45.8 313 23.6
2010/10/02 23:30 0.371 0.11 7.6 45.7 313 23.1
2010/10/02 23:45 0.374 0.11 7.5 45.6 313 21.6